Import/export and international projects

CT and MRI across borders. Every destination needs its own plan.

We work throughout Italy and neighbouring countries, with frequent projects in Africa and Asia. We connect commercial requirements with the agreed technical and logistics activities for each destination.

APPROACH

An international shipment starts long before loading

Finding suitable equipment is not enough for an international project. Origin, destination, system condition, site readiness and local contacts need to be considered together. These details identify the activities required before departure and those to organise on arrival.

Spinergy Medical handles CT and MRI import/export and agreed technical and logistics services. An enquiry may concern a complete system, relocation or a particular project stage. Defining this helps avoid overlapping responsibilities or handovers without an assigned contact.

We work with healthcare organisations, dealers and industry professionals. Destinations do not all require the same arrangements: the proposal is built around country, equipment and site information, with checks on the conditions that apply.

01

Origin and destination

Where the equipment is located, where it needs to go and who will coordinate each site.

02

System preparation

Known condition, accessories, deinstallation, packing and information needed for the move.

03

Stage coordination

The sequence connecting preparation, transport, receipt and technical work at the destination.

BEFORE DEPARTURE

Define responsibilities from origin to arrival

The commercial scope should clarify handovers between supplier, customer, transport providers, site professionals and the parties handling applicable formalities. Agree documentation, responsibilities and delivery conditions before arranging the transfer.

We do not promise that equipment is automatically suitable for every country. Documentary and destination checks require project information and the involvement of the relevant competent parties. Equipment availability is separate from readiness to proceed with delivery and installation.

MRI magnet prepared for moving
Preparation and transport form part of the international project sequence.

THE DESTINATION MATTERS

The receiving site needs to be part of the plan

Access routes, internal paths, available space and progress on building work affect scheduling. Transport arranged without site coordination can leave the most important handover unresolved: placing and integrating the system at the facility.

Start with country and city, required modality, any preferred model, room status and approximate date. If equipment has already been identified, add its location and available information. We can then define the pathway to explore and the contacts to involve.

  • Origin and destination country and city
  • Complete system or specific activity required
  • Room readiness and access availability
  • Technical and commercial project contacts

USEFUL QUESTIONS

Before getting started

Do you work outside Italy?

Yes. We work throughout Italy and neighbouring countries, with frequent projects in Africa and Asia. Feasibility and scope are defined for each destination.

Can the project start with equipment sourcing?

Yes. We collect modality, configuration, destination and priorities to assess opportunities through our commercial network, distinguishing sourcing from confirmed availability.

Can transport and installation be part of the same proposal?

They can be coordinated within one project. The proposal should specify included activities, responsibilities, dependencies and destination conditions.

Start with the destination.

Country, city, equipment and approximate timing: tell us about the project to identify the activities to coordinate.