SPINERGY METHOD

Terminology, checks and scope must describe the same equipment

“Used”, “tested” and “refurbished” are not synonyms. Public descriptions must correspond to the work actually completed and the documents available.

APPROACH

Three definitions that must remain distinct

A used system has had a previous operating life; this definition alone does not imply checks, work or warranty. “Tested” is used only when the tests, date and conditions are stated. “Refurbished” requires a documented scope of work for the specific equipment.

The commercial listing separates what is included, optional or dependent on the destination. Transport, building work, installation, acceptance and support are never left implicit.

01

Used

The starting commercial condition; checks and interventions are not implied.

02

Tested

A definition linked to stated tests, date, conditions and documented result.

03

Refurbished

A definition linked to a recorded scope of work completed on the equipment.

04

Configuration

Accessories, software, coils, documents and services are listed explicitly.

BEFORE PUBLICATION

Identity, data provenance and approved photography

Public stock code, manufacturer, model, year, status and configuration are collected without exposing serial numbers, internal references or customer information.

Photographs must show the equipment or activity described, contain no metadata and avoid unauthorised people, logos, plates or customer environments.

  • Public stock code
  • Commercial status and last-check date
  • Configuration and accessories
  • Available documentation
  • Approved original photography
Detail of technical work on an MRI system
Commercial evidence starts from data and work that can be documented.

PROJECT SCOPE

Equipment and services are described separately

Equipment condition does not automatically define the project scope. Deinstallation, packing, transport, site preparation, installation, tests and acceptance are quoted or excluded clearly.

The aim is to let customers compare proposals on the same basis, without turning a photograph or commercial name into a promise.

  • Included activities
  • Optional activities
  • Site prerequisites
  • Stakeholder responsibilities
  • Agreed acceptance criteria
MRI magnet prepared for technical moving
Transport and installation form part of the project only when explicitly stated.

WORKING FRAMEWORK

From stated data to the agreed delivery

The final sequence depends on the equipment and site; these steps define the minimum information structure.

  1. 01

    Identify

    Equipment, configuration, known condition and documentation.

  2. 02

    Check

    Applicable tests, limitations and information still missing.

  3. 03

    Define

    Work, services, exclusions, responsibilities and acceptance criteria.

  4. 04

    Document

    Available evidence, completed work and status communicated to the customer.

USEFUL QUESTIONS

Before getting started

Is used equipment automatically tested?

No. “Tested” is used only when the tests and conditions of the check are stated.

Does refurbished mean as new?

No. The term must refer to specific documented work and must not imply generic equivalence with new equipment.

Are transport and installation always included?

No. Included, optional and excluded services must be stated in the proposal for the specific destination.